JERSEY CITY | 207 Van Vorst St | FT | 15 + 15 FLOORS


#1

http://jerseydigs.com/fields-begins-construction-phase-ii-207-van-vorst-street/

Snap some photos if you’re in the area!


#2

Thanks for adding this. I have walked past many times but assumed it was only the field house for the prep school. I took these on sept 3rd. Ill keep posting updates as I walk past in the future.


#3

10/19


#4

11/16


#5

Nice updates as always @JC_Heights.


#6

I think I count 13 floors. So maybe 2 more to go?

They were already driving piles today for the second building.

1/11


#7

Phase 1 is topped out. Phase 2 pilings are set and waiting to build soon.

2/17


#8

3/29


#9

4/18.

Pumping concrete for phase 2


#10

5/27


#11


#12

Phase 2


#13

From last week


#14

Phase I (on the left) basically done. Phase II rising on the right:


#15

Phase 2 topped out

Today


#16

Today


#17

Today


#18

@fieldsconstructionco
Can’t wait to see that plaza level open!


#19


#20

Couple days ago